Projects

First job in the renewable energy sector

July 2020 till …

  • Holding devices that are used in renovation and new construction of wind turbines.
  • We take care over the complete production of welded parts and the associated mechanical processing
  • Sample assembly directly on site
  • Delivery of the components to neighboring Belgium

Gustav Grimm, Road rail frame

August 2019 till March 2020

previous arrow
next arrow

Slider
  • Complete manufacturing control of the track rail frame including preassembly in the factory
  • Creating and review of the quality documentation
  • Execution of all necessary quality checks
  • Complete construction site assembly including the surveying work up to the final check of the customer

Location in Germany

previous arrow
next arrow

Slider

A small inside view of the new workshop of Mueller-Stahl build in 2019 in Netphen, Germany. With our own X-ray room it’s possible to analyse also big parts like tanks.

Graphite heat exchanger, tank construction and steel building

November 2019 till …

previous arrow
next arrow

Slider
  • Manufacturing control, expediting and inspection of big tanks and heat exchanger for chemical plants at suppliers in Europe
  • Non-destructive tests at the suppliers
  • Review of the quality documentation acc. to AD rules and standards
  • Checking of welding procedures and ITP’s as well as checking the drawings for welding and assembly

NUCOR CGL → Galvanizing line

October 2019 till …

previous arrow
next arrow

Slider
  • Manufacturing control of equipment for a galvanizing line at different supplier in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

TKSFBA10 → Galvanizing line

October 2019 till …

previous arrow
next arrow

Slider
  • Manufacturing control of equipment for a galvanizing line at different supplier in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

TPHH → Phosphor Recycling plant in Hamburg, Germany

October 2019 till …

previous arrow
next arrow

Slider
  • QA – tasks in the area of production and on the construction site, during the assembly phase.
  • ITP as well as creation of a test plan and coordination wth the various component manufacturers and system manufacturers.
  • Tracking the manufacturing phase including the monitoring of deadlines.
  • Tracking the construction site assembly of the individual suppliers.

Div. Projects → Equipment for coil transportation system

September 2019 till …

previous arrow
next arrow

Slider
  • Manufacturing control of equipment for coil transportation systems in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

Gräbener Maschinentechnik→ ATA

August 2019 till …

previous arrow
next arrow

Slider
  • Manufacturing control and inspections of welding of big frames for a press in Germany
  • Review of Non-destructive tests as well as quality documentation

Slaf Kali → Welded and machined equipment for mining industrie

June 2019 till …

previous arrow
next arrow

Slider
  • Manufacturing control and inspections of big drums at suppliers in Germany and Romania
  • Single part inspections of bearing housings, drive shafts, etc. at suppliers in Germany and Spain
  • Creating and review of the quality documentation. Checking of welding procedures and ITP’s as well as checking drawings for welding and machining
  • UT inspections of welding seams
  • Expediting at the suppliers 

Olko Olfen

April 2019 till June 2019

previous arrow
next arrow

Slider


  • Manufacturing control and inspections of base frames, drums and brake stands in Poland
  • Responsible for carrying out expediting and inspections
  • Creating of QCP’s and inspection plans for the supplier
  • Review of the quality documentation

DP World → High bay warehouse for maritime container

January 2019 till february 2020

previous arrow
next arrow

Slider
  • Manufacturing control of 2 stacker cranes and container transport system in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

Trunnion, Grinding table, Discharge Head

June 2018 till …

previous arrow
next arrow

Slider


  • Measurements of big parts
  • Measurements on the machine and by hand at the supplier
  • Non-destructive tests -> MT at the parts

Global 1 und 2 → Parts for cruise liner

July 2018 till December 2018

previous arrow
next arrow

Slider


  • Expediting
  • Coordination of visits at the supllier and their sub-supplier
  • Inspection at the supplier to keep the delivery dates for “Just in Time" assembly at the shipyard

CIECH → Head exchanger, column, crystalliser, thickener, cleaner, circulation line

June 2018 till December 2018

previous arrow
next arrow

Slider


  • Manufacturing control and inspection of big tanks for chemical plants at the supplier
  • Monitoring of the assembly and open points on site
  • Review of the complete documentation
  • Checking of welding procedures and ITP’s as well as checking the drawings for welding

Leiber processing machine

June 2018 till September 2018

previous arrow
next arrow

Slider


  • Manufacturing contral and expediting of a tool machine
  • Special attention was to keep the delivery date
  • Test run as well as reaching the number of pieces at the supplier
  • Attendance during dismantling until loading on the truck’s

Div. Parts for presses → Measurement of small parts

May 2018 till 

previous arrow
next arrow

Slider


  • Measurement of small parts for presses
  • Measurement by hand at our client location
  • Documentation of the results and creating NCR

Site assembly of ring roll transport

May 2018 till June 2018

previous arrow
next arrow

Slider


  • Complete assembly of a ring roll transport
  • Mechanical assembly and adjustment of the equipment on the foundation
  • Survey work

Tianqi2 ->Pumps, tanks, ventilators, centrifuge

February 2018 till August 2018

previous arrow
next arrow

Slider


  • Manufacturing control and insection of big tanks and machines for chemical plants all over Europe
  • Responsible for carrying out expediting and inspections
  • Review of the complete documentation

NYPP1/3 → Welded and machined parts for mining industry

January 2018 till September 2018

previous arrow
next arrow

Slider


Manufactoring control and inspection for welding of big drums for mining industry at a supplier in Poland and Germany. Single part inspection of bearing housings and other machined parts.

Review of the complete documentation. Checking of welding procedures and ITP’s as well as checking the drawings for welding and machining. Non-destructive tests ->  UT at welding seams. Expediting of the manufacturing for the drums in Poland.

Site assembly ingot mould pusher

November 2017 till December 2017

previous arrow
next arrow

Slider


  • Complete assembly of an ingot mould pusher
  • Mechanical assembly and adjustment of the quipment on the foundation
  • Survey work

Filterconstruction Hamon → expediting, production monitoring

January 2017 till …

previous arrow
next arrow

Slider
  • Production support as well as inspections and approvals of filter products at home and abroad.
  • Complete responsibility in the area of expediting and inspection area at suppliers.
  • construction inspections.
  • Creation of the associated QCP’S as well as test plans or ITP’S for the manufacturer.
  • Tracking the complete documentation including documentation review.

Div. Projects → Equipment for Aluminium rolling mills

May 2016 till …

previous arrow
next arrow

Slider
  • Manufacturing control of equipment for aluminium rolling mills in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

Div. Projects → Equipment for packing and inspection lines

2015 till …

previous arrow
next arrow

Slider
  • Manufacturing control of equipment for packing and inspection lines in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

EPSSN → Parts for a rolling mill

August 2015 till December 2016

previous arrow
next arrow

Slider


  • Inspections of div. equipment for a rolling mill at suppliers all over Europe
  • Review of quality documentation and reporting

ESCO-Rail mill 650/ Rolling mill for Iran → 6 mill stands,  turn- and take over devices, roller tables, manipulator, descalling machine

January 2015 till May 2016

previous arrow
next arrow

Slider
  • Manufactoring control in China
  • Supervision starting from cutting the material till packing
  • Expediting
  • Creating of ITP’s
  • Control of the drawings
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

Div. Projects → High bay storage for coils

2014 till …

previous arrow
next arrow

Slider


  • Manufacturing control of stacker cranes in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client

Equipment for furnace, forging manipulators  →  Clay gun, Splash cover manipulator, Lantern pinion railway substructure

since 2014

previous arrow
next arrow

Slider


  • Manufactoring control in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Consulting of our Client
  • Final assembly on clients site

Div. Projects → Steering guides

2006 till …

previous arrow
next arrow

Slider
  • Manufacturing control of steering guides in Romania
  • Supervision starting from cutting the material till packing
  • Expediting
  • Intermediate and final inspections
  • Review of the quality documentation
  • Consulting of our client